A friend of mine was at the Burg today and said the banking in turn 1 & 2 is like Winchester. He spoke with the Designer of the new track. He said they have 2 feet of clay to lay down on top of the turns and that they are spending way more than 2 million. Infield is going to be all grass plus many more neat items like stands around turns 1 & 2.
Have pictures but do not know how to insert them.
Charles Nungester (Offline)
#3
1/10/08 11:49 PM
Was down there tues and the closest track I could compare it too would be KC when it's done.
Not sure but they had raised the outside of the track by about 4 ft then around 1-2 and backstraight.
Chuck
Charles Nungester
Dave Rudisell (Offline)
#4
1/11/08 3:02 AM
The constuction is right on schedule and moving along nicely. The total cost will be over 2.5 Million for the improvements this winter. There is another seperate project going on behind the grandstands. The ditch that runs east to west through the fairgrounds is being filled in with drainage piping and such. That project was well over a million be itself. With this ditch being gone it will give us more parking and keep kids on Quads from getting hurt....Right Bob!!
Take care, Dave Rudisell
Sandy Lowe (Offline)
#6
1/11/08 8:29 PM
Thanks for the pics!
The banking must be really steep because it looks quite steep enough already in the 3rd picture.
Dirtfan (Offline)
#7
1/11/08 8:33 PM
THANKS for sharing:thumb:
Dan Hetser
"Today is a Gift, Tomorrow is not Promised"
Charles Nungester (Offline)
#8
1/11/08 9:29 PM
When I was there it looked as if they had raised the top of the turns about 4ft. and leveled from the top of the track all the way around where the wall used to be for Grandstands and maybe patio/parking in 1-2