cowboyhar69 (Offline)
  #1 2/19/12 12:47 AM
hoosierhillbilly (Offline)
  #2 2/19/12 1:54 AM
I just goT in. I was driving from evansville to columbus ohio and saw a road sign that said i-64 bridge open. I was so thrilled to see that the bridge was opened.



Now louisville and the sunnyside, lets get a few more new bridges built as you have Been discussing forever.

Posted via Mobile Device
Danny Burton (Offline)
  #3 2/19/12 2:42 PM
Now I hope they can fix up the Kennedy bridge, which needs some serious TLC.

When we leave for North Carolina in two weeks, I'm seriously thinking about heading east first to Cowboy country, then turning right onto I-75.

We'll probably drive right by the 'burg to see if that Rudisell character is hard at work.

http://www.hoseheads.com/dannyb.html

Quiet, numbskulls. I'm broadcasting.
JordanBlanton (Offline)
  #4 2/19/12 3:54 PM
Originally Posted by Danny Burton:
Now I hope they can fix up the Kennedy bridge, which needs some serious TLC.

When we leave for North Carolina in two weeks, I'm seriously thinking about heading east first to Cowboy country, then turning right onto I-75.

We'll probably drive right by the 'burg to see if that Rudisell character is hard at work.
Resurfacing of the Kennedy is set to start in April, with lane closures, but no full bridge closure. The company's supposed to have 30 days to finish from the first lane closure. After that they'll resume resurfacing work on I-71 north of downtown.
hoosierhillbilly (Offline)
  #5 2/19/12 6:52 PM
that i-71 resurface project caught me a few times. Between the Bridge and the i-71, I am glad I know my way around the surface streets. I guess all that goofing all in louisville as a teenager was a good use of my time.

Number three; You have the right to free speech; As long as You're not dumb enough to actually try it —The Clash
Danny Burton (Offline)
  #6 2/19/12 7:09 PM
Originally Posted by JordanBlanton:
Resurfacing of the Kennedy is set to start in April, with lane closures, but no full bridge closure. The company's supposed to have 30 days to finish from the first lane closure. After that they'll resume resurfacing work on I-71 north of downtown.
Thanks, Jordan. You just decided for me. Cincy bound in 2 weeks, then south.

http://www.hoseheads.com/dannyb.html

Quiet, numbskulls. I'm broadcasting.
Post Reply