View Single Post
bigq11 (Offline)
  #12 2/3/13 9:36 AM
Originally Posted by jim goerge:
Was wondering when it ever took Tom and crew a hour to rework the track I been going there since they opened and never saw that
I actually timed them once. From the time the 1st car rolled out for hot laps until the 1st rolled out for the feature was 210 minutes. 70 minutes of that time there were tractors on the track.
2 Likes: mowerman, PIT CART