View Single Post
Speedsme61x (Offline)
  #3 9/4/12 9:38 PM
Why not cut the dirt track down to the same grade as the pavement and use sheeting over part of the pavement(to widen/lengthen and easy cleaning back to pavement) and still run both? Keep a good drain system in the center of the track for rain delays. Just a thought.