View Single Post
Charles Nungester (Offline)
  #7 1/27/08 10:31 PM
Originally Posted by JETFXR:
The thing that hits me is the elevation change that is going on in 1/2.It must be 15 ft.higher than originally.When the seating in that area is reassembled that is going to be some view.The photos do not do this project justice.Where I usually shoot in turn 2 is like walking up a wall with the new banking.It is going to be FAST.Cannot wait..Bob Sell

Bob. I get the feeling some of that steepness will not be there once the fill (Surface clay) is put down. It's gonna have to be about 6ft deep in the Dish just to get a / from top to bottom. No way they could race on that banking the way it is.

Thanks againf or the photos, I too can't believe how high 1-2 are. WOnder how much work they got before they can do the wall? I sure hope they bank the wall with the banking of the track.

Take care
Chuck

Charles Nungester