Thread
:
Some photos from Lincoln Park Speedway
View Single Post
Bill Gardner
(Offline)
#
1
5/8/11 8:30 AM
Preparing for the new frontstretch wall
The track surface
This is one of the reasons why new drainage is needed.
The new concrete block for the frontstretch wall.
New Pack Truck...
(actually these are trucks delivering rock from the stone quarry)
Reply
8 Likes:
bigq11
, crawfordsville410fans,
Dannypollock24
,
JCC
,
jim goerge
, mikeham73,
VSneader2