IndianaOpenWheel.com Sprint Car & Midget Racing Forum
Forgot Password?

Reply  Indiana Open Wheel > Indiana Open Wheel Forum > OT-Louisville bridge has reopened
Thread Tools
2/19/12, 12:47 AM   #1
OT-Louisville bridge has reopened
cowboyhar69
cowboyhar69 is offline
Senior Member

Join Date: Jul 2008
Posts: 3,429
 

http://www.wlwt.com/news/30490604/detail.html

Tim Wolffrum aka Cowboy
 
2/19/12, 1:54 AM   #2
hoosierhillbilly
hoosierhillbilly is offline
Senior Member

Join Date: Jul 2007
Posts: 603
 

I just goT in. I was driving from evansville to columbus ohio and saw a road sign that said i-64 bridge open. I was so thrilled to see that the bridge was opened.



Now louisville and the sunnyside, lets get a few more new bridges built as you have Been discussing forever.

Posted via Mobile Device
 
2/19/12, 2:42 PM   #3
Re: OT-Louisville bridge has reopened
Danny Burton
Danny Burton is offline
Senior Member

Join Date: Jul 2007
Posts: 2,346
 

Now I hope they can fix up the Kennedy bridge, which needs some serious TLC.

When we leave for North Carolina in two weeks, I'm seriously thinking about heading east first to Cowboy country, then turning right onto I-75.

We'll probably drive right by the 'burg to see if that Rudisell character is hard at work.
__________________
http://www.hoseheads.com/dannyb.html

Quiet, numbskulls. I'm broadcasting.
 
2/19/12, 3:54 PM   #4
Re: OT-Louisville bridge has reopened
JordanBlanton
JordanBlanton is offline
Senior Member

Join Date: Jul 2007
Posts: 514
 

Quote:
Originally Posted by Danny Burton View Post
Now I hope they can fix up the Kennedy bridge, which needs some serious TLC.

When we leave for North Carolina in two weeks, I'm seriously thinking about heading east first to Cowboy country, then turning right onto I-75.

We'll probably drive right by the 'burg to see if that Rudisell character is hard at work.
Resurfacing of the Kennedy is set to start in April, with lane closures, but no full bridge closure. The company's supposed to have 30 days to finish from the first lane closure. After that they'll resume resurfacing work on I-71 north of downtown.
 
2/19/12, 6:52 PM   #5
Re: OT-Louisville bridge has reopened
hoosierhillbilly
hoosierhillbilly is offline
Senior Member

Join Date: Jul 2007
Posts: 603
 

that i-71 resurface project caught me a few times. Between the Bridge and the i-71, I am glad I know my way around the surface streets. I guess all that goofing all in louisville as a teenager was a good use of my time.
__________________
Number three; You have the right to free speech; As long as You're not dumb enough to actually try it —The Clash
 
2/19/12, 7:09 PM   #6
Re: OT-Louisville bridge has reopened
Danny Burton
Danny Burton is offline
Senior Member

Join Date: Jul 2007
Posts: 2,346
 

Quote:
Originally Posted by JordanBlanton View Post
Resurfacing of the Kennedy is set to start in April, with lane closures, but no full bridge closure. The company's supposed to have 30 days to finish from the first lane closure. After that they'll resume resurfacing work on I-71 north of downtown.
Thanks, Jordan. You just decided for me. Cincy bound in 2 weeks, then south.
__________________
http://www.hoseheads.com/dannyb.html

Quiet, numbskulls. I'm broadcasting.
 
Reply Indiana Open Wheel > Indiana Open Wheel Forum > OT-Louisville bridge has reopened





All times are GMT -4. The time now is 5:29 PM.


Make IndianaOpenWheel.com your homepage
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
© 2005-2025 IndianaOpenWheel.com
Mobile VersionLinks: Dave Merritt - Chris Pedersen - Carey Fox - Carey Akin - Joe Bennett - Brandon Murray - Dave Roach - John DaDalt - Racin; With D.O. - Jackslash Media