Last Monday I drove from Indy to Bedford, IN and was surprised at how much of 37 is near completion around Bloomington. It was not bad but I suspect a Friday evening will be worse.
37 is pretty much done from I69 junction to the bridge near where the Victor Pike intersection used to be. [Or near the SR46 interchange]. They have 2 of the 3 lanes open.
After the bridge [going North, or before it if Southbound] is down to 1 lane but they are in the process of paving this area so it's a minor hindrance if any.
Just to note too State Police do patrol this area heavily and no doubt will be out on Friday so watch your speed. It's still only 45mph all the way to the I-69 interchange.
In a perfect World this track would be located on the North side of Bloomington,regardless of road construction.Tv looks good for this one.Unfortuanately,a lot of people are taking a pass on this one due to the traffic situation.
Originally Posted by david mitchell:
In a perfect World this track would be located on the North side of Bloomington,regardless of road construction.Tv looks good for this one.Unfortuanately,a lot of people are taking a pass on this one due to the traffic situation.
Maybe in "Your" lil perfect world. Your watching this on TV?.............Sigh...........Me and my "Squad" will be there in force. Orange Barrels never stopped me before.