|
It’s orange barrel mating season here in indiana
|
Re: B town Friday
Last Monday I drove from Indy to Bedford, IN and was surprised at how much of 37 is near completion around Bloomington. It was not bad but I suspect a Friday evening will be worse.
Bart |
37 is pretty much done from I69 junction to the bridge near where the Victor Pike intersection used to be. [Or near the SR46 interchange]. They have 2 of the 3 lanes open.
After the bridge [going North, or before it if Southbound] is down to 1 lane but they are in the process of paving this area so it's a minor hindrance if any. Just to note too State Police do patrol this area heavily and no doubt will be out on Friday so watch your speed. It's still only 45mph all the way to the I-69 interchange. |
In a perfect World this track would be located on the North side of Bloomington,regardless of road construction.Tv looks good for this one.Unfortuanately,a lot of people are taking a pass on this one due to the traffic situation.
|
Re: B town Friday
Originally Posted by david mitchell: |
Re: B town Friday
Last time I did LPS to Bloomington, I took I think 231 south (The road straight south thru Cloverdale to 46 east or south. right into Bloomington.
|
Biggest problem at Bloomington is the disorganized parking situation when there’s a lot of RVs.
|
All times are GMT -4. The time now is 3:59 PM. |
|
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
© 2005-2024 IndianaOpenWheel.com